01
Send us your plans
Upload the plans you bought, plus your lot address. Cody reviews them personally and replies with a firm price and timeline - usually within a day or two, free and with no obligation.
Yes - and in Georgia there is a second reason on top of the usual one. The state just leapfrogged the entire Southeast on building code, which means plans drawn even three years ago are measured against standards that did not exist when they were drafted.
The work is redesigning your structure to the current code. The seal is what documents that it was done.
Cody Johnston, PE, MBA — Georgia license #PE052555. Verify with the Georgia Board of Professional Engineers and Land Surveyors.
A seal is not a service. It is a signature at the end of one.
When a professional engineer seals a drawing, they are taking personal and legal responsibility for a structural design performed under their responsible charge. Which means the design has to exist first: a foundation sized for your soil, beams sized for your spans, a lateral system that resolves the wind and seismic loads at your address, and connections detailed through a continuous load path from roof sheathing to foundation anchor. The seal documents that work. It cannot substitute for it.
There are services that will put a stamp on plans they did not engineer. We are not one of them — a stamp applied to work nobody performed will not survive a serious plan review, and it is not something a licensed engineer can ethically provide. What you get from Oakline is the engineering. The seal comes with it.
Effective January 1, 2026, Georgia enforces the 2024 IRC and 2024 IBC with the 2026 Georgia amendments - currently the most up-to-date residential code adoption in the country. Because Georgia is a mandatory-code state for the structural chapters, this applies statewide: Atlanta suburbs, Savannah, Augusta, the mountains, everywhere.
The 2024 IRC references the newest generation of design standards - ASCE 7-22 wind maps, the 2024 National Design Specification for wood, and updated bracing and connection provisions. Wind design values shifted across the state, deck and guard provisions tightened, and several framing details that passed under the old code now need engineered justification.
The blunt version: a stock plan drawn even three years ago is a code cycle and a half behind what a Georgia reviewer is checking today. That is not a defect in the plan. It is a timing problem, and it is exactly what the engineering step exists to solve. You do not need to re-buy the plan.
A house plan shows what your home looks like. These are the structural items it almost never carries — and the ones that generate correction letters:
The coast - Savannah, Brunswick, the Golden Isles - carries hurricane wind design and wind-borne debris provisions comparable to the Carolinas. Continuous load path design, elevated foundations, opening protection.
Metro Atlanta and the Piedmont are calmer wind country, but red-clay soils, basements, and steep infill lots push foundation and retaining design to the front. A generic catalog foundation detail on a sloped Atlanta lot with a walkout basement is one of the more common things we redesign.
And the North Georgia mountains - Blue Ridge, Blairsville, Clayton - add snow loads and mountainside foundations that flatland framing tables were never written for.
01
Upload the plans you bought, plus your lot address. Cody reviews them personally and replies with a firm price and timeline - usually within a day or two, free and with no obligation.
02
Foundation, floor and roof framing, beams, bracing, and connections - designed for your lot, your soil, and the code Georgia actually enforces, then sealed under license #PE052555.
03
Permit-ready drawings your reviewer accepts and your builder can actually build from. Typical turnaround is about two weeks.
Good engineering usually pays for itself. Right-sizing beams and footings to your actual loads — instead of the worst-case assumptions baked into a catalog plan — regularly saves more in lumber and concrete than the engineering fee costs.
The 2024 IRC and 2024 IBC with 2026 Georgia amendments, effective January 1, 2026 - currently the most current state code adoption in the country. It applies statewide.
The architecture is fine. The structural side will need updating - the 2024 IRC uses newer wind maps and design standards than plans drawn to 2018-era codes. We redesign the structural system to the current code and seal it for your permit submission. You do not need to re-buy the plan.
Yes. Snow loads, steep-slope foundations, and tall walkout basements are exactly the conditions that push a home past the prescriptive code and into engineered design. Handled remotely with sealed drawings.
More on how we work across the state: structural engineering in Georgia · all service areas · general FAQ
A free review, a straight answer about what your Georgia project actually requires, and a firm price in a day or two. If your plans don't need engineering, he'll tell you that too.