01
Send us your plans
Upload the plans you bought, plus your lot address. Cody reviews them personally and replies with a firm price and timeline - usually within a day or two, free and with no obligation.
Almost always, yes. But South Carolina is the state where a purchased plan is most likely to be quietly, invisibly wrong - because two of the loads that govern structural design here are ones a national catalog plan cannot have accounted for.
What you need is not a signature. It is a structural design that resolves hurricane wind and earthquake loads at the same time, which sometimes pull the building in different directions.
Cody Johnston, PE, MBA — South Carolina license #43080. Verify with the South Carolina Board of Registration for Professional Engineers and Surveyors.
A seal is not a service. It is a signature at the end of one.
When a professional engineer seals a drawing, they are taking personal and legal responsibility for a structural design performed under their responsible charge. Which means the design has to exist first: a foundation sized for your soil, beams sized for your spans, a lateral system that resolves the wind and seismic loads at your address, and connections detailed through a continuous load path from roof sheathing to foundation anchor. The seal documents that work. It cannot substitute for it.
There are services that will put a stamp on plans they did not engineer. We are not one of them — a stamp applied to work nobody performed will not survive a serious plan review, and it is not something a licensed engineer can ethically provide. What you get from Oakline is the engineering. The seal comes with it.
South Carolina enforces the 2021 International Residential Code and 2021 IBC with South Carolina amendments, statewide since January 1, 2023. The state Building Codes Council runs a mandatory adoption cycle, so every SC jurisdiction reviews against the same editions - you do not have to guess which code your county uses. The 2024 editions are working through the Council process now; we design to whichever edition your office enforces the day you submit.
That 2021 edition matters more than it sounds. It pulls in newer wind provisions and tightened bracing requirements compared to the older codes most stock plans were drawn to. A plan set drafted for a 2015-code state routinely needs its wall bracing, uplift connections, and header designs reworked before a South Carolina reviewer will pass it - even when the plan itself is perfectly good architecture.
A house plan shows what your home looks like. These are the structural items it almost never carries — and the ones that generate correction letters:
The Charleston region carries some of the highest seismic design values on the East Coast, a legacy of the 1886 earthquake. Homes across much of the Lowcountry are designed for earthquake loads that rival parts of California. That changes shear wall layouts, hold-down hardware, and foundation detailing in ways that are structural, not cosmetic.
A stock plan from a national catalog has never heard of this. It cannot have - the same plan is sold in Ohio.
Upstate - Greenville, Spartanburg, Rock Hill - the wind and seismic demands ease considerably. But sloped lots, walkout basements, and fast-growing subdivisions keep engineered foundations and retaining conditions firmly in the picture.
01
Upload the plans you bought, plus your lot address. Cody reviews them personally and replies with a firm price and timeline - usually within a day or two, free and with no obligation.
02
Foundation, floor and roof framing, beams, bracing, and connections - designed for your lot, your soil, and the code South Carolina actually enforces, then sealed under license #43080.
03
Permit-ready drawings your reviewer accepts and your builder can actually build from. Typical turnaround is about two weeks.
Good engineering usually pays for itself. Right-sizing beams and footings to your actual loads — instead of the worst-case assumptions baked into a catalog plan — regularly saves more in lumber and concrete than the engineering fee costs.
The 2021 IRC and IBC with South Carolina amendments, statewide since January 2023. The 2024 editions are in the state adoption process; we design to whichever edition your jurisdiction enforces at permit time.
The Charleston region sits in one of the highest seismic design areas on the East Coast, from the 1886 earthquake zone. Code requires homes there to be designed for earthquake loads in addition to hurricane wind. It affects bracing layouts, hold-downs, and foundation detailing - none of which a national catalog plan includes.
Yes. High-wind design, wind-borne debris provisions, and elevated pile or pier foundations are core Oakline work. We design remotely and deliver sealed drawings your local permit office accepts.
More on how we work across the state: structural engineering in South Carolina · all service areas · general FAQ
A free review, a straight answer about what your South Carolina project actually requires, and a firm price in a day or two. If your plans don't need engineering, he'll tell you that too.