01
Send us your plans
Upload the plans you bought, plus your lot address. Cody reviews them personally and replies with a firm price and timeline - usually within a day or two, free and with no obligation.
Usually yes - but Tennessee is the one state where the honest answer starts with a question back: where exactly are you building? Two lots thirty minutes apart can be reviewed under codes six years apart.
Getting that answer right before design begins is what keeps a plan set from being rejected at intake, before anyone has even looked at your structure.
Cody Johnston, PE, MBA — Tennessee license #130921. Verify with the Tennessee Board of Architectural and Engineering Examiners.
A seal is not a service. It is a signature at the end of one.
When a professional engineer seals a drawing, they are taking personal and legal responsibility for a structural design performed under their responsible charge. Which means the design has to exist first: a foundation sized for your soil, beams sized for your spans, a lateral system that resolves the wind and seismic loads at your address, and connections detailed through a continuous load path from roof sheathing to foundation anchor. The seal documents that work. It cannot substitute for it.
There are services that will put a stamp on plans they did not engineer. We are not one of them — a stamp applied to work nobody performed will not survive a serious plan review, and it is not something a licensed engineer can ethically provide. What you get from Oakline is the engineering. The seal comes with it.
Tennessee's statewide residential baseline is the 2018 IRC, administered by the State Fire Marshal's Office for areas without their own program. But Tennessee lets municipalities opt out and run their own adoptions - and the big ones do. Metro Nashville has moved to the 2024-generation codes. Knoxville, Chattanooga, and Memphis each maintain their own editions and local amendments.
So the code question has to be answered first, not last. Confirming your jurisdiction's adopted code and its local amendments is step one of every Tennessee project we take, and we put the governing code directly on the drawings so the reviewer sees it immediately.
Enforcement varies too. Some Tennessee counties review thoroughly; some barely review at all. Light enforcement is not the same as no engineering - your lender, your insurer, and your builder all still need a structure that works, and nobody catches a foundation problem after the concrete is poured.
A house plan shows what your home looks like. These are the structural items it almost never carries — and the ones that generate correction letters:
East Tennessee - Knoxville, the Tri-Cities, the Smokies foothills - brings real snow loads and steep-slope foundation conditions: tall walkout basements, retaining walls, homes stepping down mountainsides. These are engineered-design conditions almost by definition.
West Tennessee is the opposite surprise. Memphis sits beside the New Madrid seismic zone, one of the most significant earthquake source regions in the central United States. Seismic detailing there - bracing, hold-downs, foundation connections - is a genuine design driver that plans drawn for elsewhere in the state simply ignore.
And Middle Tennessee, from Nashville through Murfreesboro and Franklin, is one of the fastest-growing housing markets in the country. That is where the bulk of our Tennessee work sits.
01
Upload the plans you bought, plus your lot address. Cody reviews them personally and replies with a firm price and timeline - usually within a day or two, free and with no obligation.
02
Foundation, floor and roof framing, beams, bracing, and connections - designed for your lot, your soil, and the code Tennessee actually enforces, then sealed under license #130921.
03
Permit-ready drawings your reviewer accepts and your builder can actually build from. Typical turnaround is about two weeks.
Good engineering usually pays for itself. Right-sizing beams and footings to your actual loads — instead of the worst-case assumptions baked into a catalog plan — regularly saves more in lumber and concrete than the engineering fee costs.
It depends on your city or county. The statewide baseline is the 2018 IRC, but municipalities adopt independently and Nashville is on newer editions. We confirm your jurisdiction's adopted code and amendments before any design work starts.
Light enforcement is not the same as no need. Your lender and insurer generally expect engineered design, your builder needs drawings they can actually build from, and resale is cleaner with documented engineering. No plan review just means nobody catches the problem before it is framed.
The Memphis area sits near the New Madrid seismic zone, and codes there carry meaningful seismic design requirements for homes - bracing layouts, hold-downs, and foundation detailing all respond to it. It is one of the strongest reasons to have a licensed engineer on a West Tennessee project.
More on how we work across the state: structural engineering in Tennessee · all service areas · general FAQ
A free review, a straight answer about what your Tennessee project actually requires, and a firm price in a day or two. If your plans don't need engineering, he'll tell you that too.